![](/image/2020/1/10/1.jpg%28mediaclass-full-width--portrait.1df3d6f438769113d26ed8577bc84d61afea2a7e%29.jpg)
Step 1
The holes for the wires : Take a mark 1.5cm from the side (outside of the box) and 3cm from the bottom. Drill a 4mm hole, straight towards the inside. Second hole : same distance from the side, but through the frame.
Repeat on the other side.